Spring 2018 Courses

ISE 428   /   ETM 528

Quality Engineering

Instructor, Dr. Joan A. Burtner, Certified Quality Engineer

SyllabusforISE428Spring2018

SyllabusforETM528Spring2018

    Updated April 25, 2018  5:03 pm

 

 

ClassDay
In-class Activities

Homework Assignment/

Extra Materials

Jan 8

 Course Overview

 

 

Purchase textbooks.
Jan 10

Statistics Review

Unannounced Quiz

 

Jan 15

Holiday    No class attendance

Jan 17

SNOW DAY ASSIGNMENT

Spring2018 ISE428ETM528 QualityEngineering modifiedforWeb

 
Jan 22 Spring 2018 Quality Engineering Hypothesis Testing Examples 12218 one sample t two sample t
Jan 24

Paper-and-Pencil Quiz on Hypothesis Testing

CQE_HandbookQualityControlTools publish Spring2018

Jan 29

Spring 2018 Quality Engineering Hypothesis Testing Examples 12418 compare Mintab and Excel

 

ISE428ETM528S18 Chapter_37SPCLecture1 Jan2018

 
Jan 31

ControlChartExamplesUsingMinitab17February2018

 

CQE3rd_ch1_QualityHistoryDemingPrinciples2016

     
     
Feb 5 Spring 2018 xbar r chart data  
Feb 7

Quiz on Chapter 37 SPC Lecture PowerPoint

and  Control Chart Examples Using Minitab 17 PowerPoint

 

Calculating UCLs and LCLs will NOT be covered on this quiz.

 

 
Feb 12

individuals data for ISE 428 ETM 528

 

ExcelDataSheetforControlChartsJanuary2018

 
Feb 14

IntroductiontoProcessandPerformaceCapabilityAssessmentSpring2018

 

 
Feb 19

Quiz on calculating control limits and evaluating Xbar, R, P, C, and U charts

Bring your handouts.

 
Feb 21 Quality history (brief)  
Feb 26

Quiz on quality history slides discussed on Wednesday

Burtner Spring 2018 HypothesisTestingExamples OneWayANOVA and Tukey update 2 26 18

 
Feb 28 Burtner Spring 2018 HypothesisTestingExample Minitab TwoWayANOVA with graphics 2 26 18  
 

SPRING BREAK

 

 
Mar 12

Minitab    Balanced ANOVA

Interaction Plots

Spring2018NonparametricLectureMarch122018publish

 
Mar 14 ISE428ETM528S18 Lecture_Introduction to ISO 9000 Family publish  

Mar

19

Open Text Book Test 1  
Mar 21

Review Test 1

Acceptance Sampling

ACCEPTANCE SAMPLING NOTES JMB March 21 2018

 
Mar 26

ISE 428 ETM 528 Chi Square Goodness of Fit Test for Minitab 17 with graphs 3 23 2018

 

ISE 428 ETM 528 Chi Square Test for Association Minitab 17 with explanation of independence vs association for CQE

Acceptance Sampling

 

ACCEPTANCESAMPLINGNOTESJMB March262018 NomogramExamples

 

 
Mar 28 Open Text Book Test 2  
     
Apr 2

Unannounced Quiz

ISE 428 ETM 528 Spring 2018 Multiple choice template Sarkar part two with example

 

ISE 428 ETM 528 Spring 2018 Multiple choice template Sarkar 1-5

 

Sarkar 515869 implementation ISO 9000 ncr metrics

 

 

 
Apr 4

ISE428ETM528S18 Chapter_26 Measurement System Analysis Lecture 1 publish April 2018

ISE428ETM528S18 Chapter_26 Measurement System Analysis Lecture 2 publish April 2018

Unannounced Quiz

Email multiple choice questions to me before April 8 at 11pm.

 

 

Apr 9

Quiz on Sarkar Acronyms

Spring 2017 Lean Hospitals Chapter 4 Dr Burtner

Minitab 17  Gage R&R    multiple regression

 
Apr 11

I will discuss simple and multiple regression in class.  I will administer the quiz on regression after the lecture.

ISE428 ETM528 FMEA DOE Control Charts PowderCoatProcessExample

 

simple and multiple regression output Spring 2018 publish

 
Apr 16

Introduction To QFD ISE428 ETM528 Spring 2018 publish with calcs

 

Graduate Presentations

 

 

 
Apr 18

Open Book Multiple Choice Exam

 
Apr 23

Guest Speaker

return exam scores

Discuss journal article summary/critique assignment due April 28

More Lean Hospitals presentations

 
 

 

 
 

 

 
Apr 25

Finish Lean Hospitals presentations

Distribute Final Exam

 

ETM 528 publish Lean Hospitals ch 6 Merz 4 20 18

ETM 528 publish Spring 2018 Lean Hospitals Ch 8 David May post

ETM 528 publish Spring 2018 Lean Hospitals Chapter 10 Wissmach post

ETM528 publish Janea Spillers Lean Hospitals Ch3 post

ETM528_CH2_ publish Lean Hositals Ch 2 Andrew Hudson Spring 2018 post

ETM528_CH12_publish LeanHospitals Gracyalny post 4 16 18

 

 

 
Due April 28 by noon

Paper Organizers International  Part I

 

Paper Organizers International A Fictitious Six Sigma Green Belt Case Study II

 

Leveling-up QP June 2016 CMMI

 

Summary/critique instructions.  Include your name and the complete citation at the top of the page.  One-half page should be devoted to the summary.  One-half page  ( at least six sentences) should be the critique - "I" statements. Use single-spaced 12 pt Times New Roman font.

 

Examples of I statements: I thought the article was confusing.  I thought the article was well written.  Since we did not discuss this in class, reading the article helped me to understand the way complanies prepare for an audit.  I was surprised to see how long it took for the company to complete the MBNQA application.

 

 

 

Prepre a separate one-page summary/critique for each of the three articles. A paper copy of each summary/critique is due Saturday April 28 before noon

If I am not in my office, slide the papers under the office door.

Include your name and a complete citation on each critique.

 

Please do not email the critiques to me.

May 2

Final Exam due 2pm

 
 

Extra Exam Materials

 

2012_MBNQA Lockheed_Martin_MFC_Application_Summary

 

 

 

 

 

Takata_report_internal_investigation

 

rootcause Ford Firestone_public_citizen_org

 

 

Company Interview Tyson Foods permission to publish Spring 2018

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Previous Course Materials

 

 

 

 

 

*****

 
  RecallFordFirestoneJoeyMoore  
     
March 23 ISE428ETM528S16 Chapter_37 SPC Lecture 1 Feb 2016 Excel Data Sheet for Control Charts Feb 2016
March 28 CQE_HandbookQualityControlTools publish final  
March 30

Introduction to Acceptance Sampling --

Operational Definitions

 

 

Gage R&R

Gage R&R

 

Introduction to Process and Performance Capability Assessment Spring 2016

 

ISE428ETM528S16 Chapter_26 Measurement System Analysis Lecture 2 publish April 2016

 

ISE428ETM528S16 Chapter_26 Measurement System Analysis Lecture 1 publish April 2016

 

MBNQA Categories

Using Minitab to build various control charts

quality engineering data March 16 2016
Apr 4

Introduction to Acceptance Sampling --

Single Sampling Plans

Nomograms 

ACCEPTANCE SAMPLING NOTES JMB April 4 2016

 
Apr 6

ACCEPTANCE SAMPLING NOTES JMB April 6 2016 Nomogram Examples

ISE 428 ETM 528 Acceptance Sampling MILSTD Examples Spring 2016

  ISE428ETM528S16Chapter_23AcceptanceSamplinglecture2April2016  
     
Apr 11 ISE428ETM528S16 Lean Healthcare Deployment Overview Apr 11 2016 vpublish  
  KristinaHansonISE428ETM591S14LeanHealthcareDeploymentOverviewPages24-26  
  Lean Delivery Graduate Student Presentation Final  
Apr 13 QualityMethodsAppliedtoPowderCoatProcess IIE Annual Conference Presentation by JMB  
Apr 18 ETM528_LeanHealthcareDeploymentandSustainability_CH12 Bradshaw and Odom  
  ETM 528 spring 2016 Herrmann and Wright Lean Healthcare chapter 13 publish  
  ETM528_LeanHealthcareDeploymentandSustainability_CH14AlexByrd  
  ETM 528 Spring 2016 A_Ginn CH 16 Lean Healthcare Deployment  
  ETM 528 Spring 2016 Murtaugh_LeanHealthcareDeployment Ch17_Project  
Apr 20 Acceptance Sampling Exercises  
Apr 25 Acceptance Sampling Exercises review                   Journal Article Assignment  
Apr 27 Minitab Quizzes  
  ISE428 data for 4 27 16 quiz  
     
Apr 29, 2014

Quality Interviews

ETM591Spring2014_KatieMasonInterviewsAntilinaHarris

ETM 591Spring2014_SteveWarrenInterviewsScottCuster

ISE428Spring2014_AlexandraBlahaInterviewsStaceyOdom

ISE428Spring2014_Lucas MeyerInterviewsRogerAlvarez

ISE428Spring2014_RyanKingInterviewsMartinCuellar

ISE428Spring2014_WeslieWillifordInterviewsMikeDrexler

 
 

ETM 591 Quality Interview Stacey Odom Northside Hospital permission to publish

West Valley Hospital Quality Interview Report permission to publish JMB edit

ETM591_ShamreenPradhanInterviewsJonathanPhillips

ChrisMarkmanQualityInterview ISE428Spring2014 JMB editor

ISE 428 Quality Interview NorfolkSouthern_ASWIV_03-26-2014

 
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
Mar 24

 

 

 
Mar 26

 

Mar 31  
Apr 2  
Apr 7

ISE428ETM591S14 QualityHistory DemingPrinciples DevorVersion 2014 publish

QFD Exercise 2  in class

Steves weight data
Apr 9

Introduction To QFD IDM 404 ISE428 ETM591Spring 2014 publish

QFD Exercise 1  in class

Apr 14

Overview of Lean Healthcare Deployment and Sustainability text

ISE428ETM591S14 Lean Healthcare Deployment Overview Feb 17 2014 vpublish

Apr 16

 

IIE ASQ Quality Drives Lean Conference Presentation by JMB

QualityMethodsAppliedtoPowderCoatProcess IIE Annual Conference Presentation by JMB
Apr 21 ASEESE article written by Dr. Kunz
Apr 23 Dr. Dick Kunz question/answer session
 
 

 

 

LeanHealthcare ETM591 Presentations  
KMason RKing ETM591Presentation_burtner

 

Shamreen Pradhan_Ch4HPA YoonWarren_Chapter9
Christie LEAN_Hutchison Emma Grose LEAN Presentation

 

 

*****Quality Interviews*****