ISE 327
Statistical Quality Design and Control
Instructor,
Dr. Joan A. Burtner, Certified Quality Engineer
Associate Professor
of Industrial Engineering
Class |
Discussion/Notes |
HW |
Assignment |
|
Aug 21, 2013 |
|
HW 1 |
Find statistics text. Review statistics
notes. |
Aug 26, 2013 |
Aug 26 |
Minitab
lab 1
Burtner
Fall2013 Hypothesis Testing Examples Part 1 REV1 DISTRIBUTE
|
HW 2 |
Study for quiz on hypothesis testing. |
Aug 28 |
Aug 28 |
Minitab
lab 2
ISE327F13
HypothesisTestingExamples One Way ANOVA JMB 82813 DISTRIBUTE |
HW 3 |
Study for quiz |
Sept 2 |
Sept 2 |
Holiday - No class attendance |
HW 4 |
Redo ANOVA examples using Excel. |
Sept 4 |
Sept 4 |
ISE327F12_Lecture
QualityHistoryDemingPrinciplesDevorVersion Sept52012 |
HW 5 |
Study for quiz on Quality Time Line |
Sept 9 |
Sept 9 |
ISE327_hypothesis
testing examples with ANOVA DISTRIBUTE |
|
|
Sept 11 |
Sept 11 |
Survey of Chapters 1 and 2 in Devor |
HW 6 |
Study for quiz on Deming's 14 points (1-7) |
Sept 16 |
Sept 16 |
ISE327F13_Lecture
ConceptualFrameworkforSPC DevorVersion 2013 |
HW 7 |
Study everything we have discussed so far. |
Sept 18 |
Sept 18, 2013 |
EXAM
1
|
|
ISE327
Statistics Review |
Sept 23 |
Sept 23 |
Conceptual
Framework for SPC
Process
Control vs. Capability
Purposes of Shewhart Control
Charts |
|
|
Sept 25 |
Sept 25 |
Shewhart
Control Charts for Variable Data
Four Tests
for Control Chart Interpretation
Discussed ways to enhance
control charts built using Excel. |
HW 8 |
Problems 6.4 and 6.5 - Set up control charts. |
Sept 30 |
Sept 30 |
Eight
Tests for Control Chart Interpretation
Discussed
Devor's 8 tests for special causes. |
HW 9 |
Problems 6.4 and 6.5 - Evaluate control charts for
special causes. |
Oct 2 |
Oct 2 |
Using
Minitab to assess variables control charts for eight tests
QUIZ on
symbols and tests for special causes |
HW 10 |
|
|
|
FALL BREAK |
|
|
|
Oct 7 |
ISE
327 laboratory exercise
QUIZ on
evaluating charts for special causes |
|
|
Oct 9 |
Oct 9 |
IN CLASS EXERCISE:
Using Minitab
to construct trial control charts |
HW 11 |
Prepare for quiz on using Minitab to construct trial
control charts |
Oct 14 |
Oct 14 |
Closing
the Loop Using the Process of SPC
(Common
quality tools) |
HW 12 |
Read case study from Chapter 6. |
|
Oct 16 |
NO
QUIZ today
In-class
exercise 6.19 abc
ISE327
Fall2013 Chapter 6 Problem 19 |
HW 13 |
Complete problem 6.19
a b c d
You will need to use Excel
for part d.
Study for Monday's quiz. |
|
Oct 21 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nov 18 |
Test 2 |
|
|
|
Nov 20 |
NO CLASS ATTENDANCE - refine your operational definitions for the
paper clip design project |
|
|
|
Nov 25 |
We discussed nomograms and acceptance sampling principles.I distributed
Acceptance Sampling Notes and duplicate copies of the design project
instructions. |
|
Email me your design project operational definitions for approval.
I will distribute the lots of paper clips in class on Monday if your
definitions have been approved. |
|
Dec 2 |
We will review operational definitions and nomograms. We will
discuss how to conduct a process capabilty study. |
|
Bring your measuring
instruments and guides so that we can do 100% sampling of your lot.
Complete problems 10.4
abc and 10.5 ab. |
Dec 4 |
|
|
|
|
|
Dec 11 |
To
all of the students who turned in their design projects today:
I
cannot grade your project until you return your paper clip package. |
|
If I am not in my office, bring your paper
clip package to the Mrs. Collins in the Dean's Office. |
|
|
|
|
|
|
|
|
|
|
|
|
Test 2 327
Test2 Problem 3 and 4 |
|
|
|
|
Design Project Instructions and Report Format:
ISE
327F12 DESIGN PROJECT Instructions PUBLISH Final Version |
|
|
|
|
ISE327FinalExamData |
|
|
|
|
Devor
Chapter6 pr16 data |
|
|
|
|
|
|
|
|
|
|
|
|
|